It’s now a campervan

The last few weeks we’ve been too busy to post, and the few weeks before that were frantically finishing the van.

We spent a few weeks varnishing at every available moment  – sometimes squeezing a quick coat in before work, while dinner was cooking or just before bed.

We then spent a weekend putting all the furniture in van – which was surprisingly difficult to ensure things were vaguely straight and upright. We also had to incorporate fixing the water pump, pipes and gas regulator at appropriate points to ensure we had room to fix things down.

During the next week Dave spent most of his spare time working out how the sliding table rail and leg (that were meant to work together) would ever fit nicely in the van. After a few days, the table leg was cut in half. Drastic, but it works very well, although we do have the lower half of the leg floating around the van ready to be used when the table is put up.

This all meant that we had everything needed to change the DVLA status of the van to a motor caravan. It also allows us to change the insurance to that of a motor caravan rather than a motor caravan in conversion.

It doesn’t mean the van is finished though. We still need to connect some of the electrics (mains charger and usb chargers for our electronics) and fit removable things such storage boxes, pots, pans, plates etc etc. The window insulation also needs some thought.

Further plans include some major renovations to the cab interior and maybe the addition of a sound system for the rear.

We have spent a few nights in it though – a quick trip to Scotland for a wedding, and a CUHWC trip to the Lakes. We found the van a bit cold on some nights, but lovely and warm on others. Living in it has shown us what we need to add to the van – but doing those things may take a while in the cold Cambridge evenings.

Furniture Finished

All is built, it just needs varnishing and the final glueing together.

Furniture build – the shelves and bed

We spent today building the bed and shelves out of ply. Still needs varnishing and sticking together, but well on the way.

It was highly entertaining trying to make things vaguely horizontal and vertical when the van has no straight edges and nothing truly vertical.

Conversion (and life) update

Quite a few things have happened since the last conversion-related post, both to the van and otherwise.  To sum up: we finished the carpeting, put the lights in (mostly), had windows and a seat/bed professionally fitted, started planning and buying the furniture, went sailing (see previous two posts), and spent six weeks in Arctic Norway (see next post…coming soon).  Jo also passed her viva, did her corrections and got a job, and the van passed its MOT.

The silver carpet went on with barely a hitch – Dave did some of it while Jo was away in the Lake District assessing silver D of E groups for Cottenham Village College, and both of us finished it off the following week.  We’d been using less than the suggested amount of adhesive for the walls, but made sure we used the full quantity for the ceiling!  Dave also fitted eight spotlights with individual switches into the ceiling carpet, though the battery is yet to be connected.  Some trimming, tidying and white spirit later, the inside was looking very smart, and the van was ready to be taken to Bletchley near Milton Keynes for the summer.

We left it in the care of Young Conversions, who had kindly agreed to look after it while we were in Norway, even though the work we’d asked them to do on it would only take a few days.  Having had to move it out of and back into their workshop every day for six weeks, they were quite glad to see the back of it when Jo picked it up at the end of August!  Thanks to their efforts, the van is now equipped with two large privacy-glass windows, one on each of the middle panels, and a crash-tested seat (meaning we can legally transport two passengers in the back) that folds down into two thirds of a bed – Dave will explain this one in a future post about furniture!

Our priority now is to get the van into a state that our insurers will accept as meeting its conditions for a camper van, which include a fixed stove and gas supply, running water and an attached table.  We’ve pledged most of our weekends in the coming month or so to the project in the hope that this will be done by the end of October – we want to spend our first night in the van on the first weekend in November…

Here are some pictures of the new developments: